Output up 200% by digitising manual engine assembly

Engine assembly line

Audi’s manual engine assembly line in Aurangabad.
Audi’s manual engine assembly line in Aurangabad.
Audi logo

About the customer

Audi localised engine assembly at the Škoda plant in Aurangabad, India, while maintaining the standardised assembly sequences established at its European engine plant in Győr, Hungary.

200%

Increase in production output

50%

Reduction in training times

100%

Process tracking and traceability

The challenge

What had to change

01

60 variants. Just six stations.

A 2-litre petrol engine and a six-cylinder diesel engine, with all 60 variants, had to be assembled on one fully manual line. With a 45-minute Takt time, operators faced hundreds of complex steps and small but critical differences between parts.

02

Automated standards in a manual environment

Quality-critical processes that were automated in Hungary now depended on operators selecting the right parts and following the correct sequence.

03

Two operators sharing the same tools

When the number of operators per station doubled, equipment stayed the same. Up to nine bolting tools per station needed to be shared without assigning conflicting tasks.

The solution

How ODIN Workstation changed the line

Variant-specific visual guidance

ODIN Workstation guides each operator through the correct instructions for the engine variant. Process engineers define processes, images, quality checks and connected devices without hard coding.

Quality checks at every operation

A button confirmation, barcode scan or measurement validates each operation before work continues, ensuring the correct product is built to the required standard.

Device arbitration

The system respects priorities set by the process engineer and does not assign an operation if its tool is already being used by another operator. The case study reports that this enabled output to double without additional equipment.

A controlled route through rework

RFID-tagged trolleys cannot enable work at the wrong station. Failed operations are flagged for rework, where instructions show what to repair or disassemble. Only the confirmed disassembled operations are repeated when the engine returns to the line, followed by final testing and a pass barcode.

Digital assembly instructions at the workstation.
Digital assembly instructions at the workstation.
An engine at the rework station.
An engine at the rework station.
Rework station layout from the case study.
Rework station layout from the case study.

The results

What changed for Audi

  • 50% reduction in training times.
  • 100% process tracking and traceability.
  • 200% increase in production output.
  • Faster changes and additions to engine variants.
  • Integrated rework reduces scrap and protects process compliance.
“This allowed the customer to double the output without buying additional equipment.”
Audi case study · Device arbitration

Transform the way your factory runs with ODIN Workstation

Gearbox assembly line with robots

Watch the demo

Discover how ODIN Workstation enforces every step on the line.

Assembly Line Pain Bible cover

Assembly Line Pain Bible

How many of these pains can you identify with every day?

Get the Pain Bible
Smart Scaling Playbook cover

Get the guide

Download the Smart Scaling Playbook for growing output without new lines.

Download playbook
ODIN Workstation expert

Book a demo

Learn how ODIN Workstation saves you time and money.

Contact us